Indian Bend Road Improvements

This multiple award-winning project is located on a highly-visible and heavily-traveled road that is an access point for major retail and includes high-volume events and daily commuter traffic. This one-mile roadway improvement project was constructed while providing high-profile businesses and residential traffic access throughout the construction period. This project required the rapid mobilization of several crews while meeting a very rigid schedule. Using flexible phasing planning, Hunter Contracting Co. successfully worked through a very challenging utility relocation and an accelerated schedule that saved time for the community.

Client:
City of Scottsdale
Completion:
February 2012
Delivery Method:
CMAR
Design Engineer:
URS
Cost:
$20.05M
  • Artistic elements
  • Con-Arch™ bridge (10 cell)
  • Concrete
  • Curb and gutter
  • Drop structures
  • Enhancement to the bridge railing, bridge piers,
    abutments, and wing walls
  • Landscaping
  • Multi-use path
  • New pavement
  • Recreational areas
  • Retaining walls
  • Sidewalk
  • Signalized intersections of arterial roadway
  • Storm drain improvements
  • Underground utility improvements
  • Utility relocations
  • Widening and reconstruction of roadway from Scottsdale to Hayden Roads with modifications at both intersections
Indian Bend Rd1
Photo 03 small

AWARDS

American Council of Engineering Companies (ACEC)

2010 Grand Award

Arizona Forward – Valley Forward

Valley Forward Association, Environments Excellence Awards Program Award of Merit

Southwest Contractor

Best of 2010

American Public Works Asociation

APWA Public Works Project of the Year,
Transportation $5 Million – $25 Million