Dysart Road Waterline

This project installed 6,200 linear feet of new 12-inch ductile iron pipe and 500 linear feet of 6- and 8-inch laterals under Dysart Road from approximately 500 feet north of Varney Road to the future Joe R. Ramirez alignment. The project also included 50 linear feet of 30-inch steel casing for the future railroad, gate valves, blow-offs, new fire hydrants, reconnection of the existing mains and services to the new line, and replacement of the pavement, curb, and gutter.

Client:
City of El Mirage
Completion:
July 2019
Delivery Method:
JOC
Design Engineer:
EPS Group
Cost:
$1.37M
  • 10 blow-offs
  • 10 services
  • 200 linear feet of 8-inch DIP
  • 300 linear feet of 6-inch DIP
  • 3,225 linear feet of existing waterline
    (capped and abandon in place)
  • 35 gate valves (12-, 8-, and 6-inch)
  • 50 linear feet of 30-inch steel casing for future railroad
  • 500 linear feet of 6- and 8-inch laterals
  • 6 new fire hydrants
  • 6,200 linear feet of 12-inch DIP
  • Remove and replace: fire hydrant, curb and gutter, and pavement