Roosevelt Water Conservation District Main Canal Project

The most critical part of this project was installing a new radial gate structure in the Main Canal at US60 and RWCD that had to be completed during the RWCD dry-up. Hunter Contracting Co. worked on maintaining the schedule and demanding coordination to be prepared for RWCD's dry-up period. Work included removing the existing radial gate structure, irrigation pipe, irrigation structure, existing concrete canal liner, and concrete pad. A new radial gate structure was constructed, including stop log storage vaults, shotcrete canal liner, manholes, and a turnout structure and gate. Additional work included a retaining wall and reshaping the channel bottom.

Client:
RWCD
Completion:
July 2018
Delivery Method:
DBB
Design Engineer:
CMT Engineering
Cost:
$958k
  • Bypass pumps
  • Channel/shotcrete
  • Concrete channel lining
  • Existing gate structure, channel and lining, and turnout structure demo
  • Manholes
  • Existing pipe removal
  • Radial gate structure
  • Retaining walls
  • Turnout structure
  • Underground utilities