Tangerine Road Improvements

Tangerine Road is an award-winning project for ADOT.  This project was a full reconstruction including grading, asphalt paving, concrete curb and gutter, channel construction, storm drain, retaining wall, headwall, box culvert, arched culvert, waterline, native desert landscaping, tree salvage, boxing, and tree replanting. The project also included a decorative, bright, and open multi-use underpass structure that allows pedestrians and wildlife to cross under the street safely.

Client:
Oro Valley
Completion:
April 2006
Delivery Method:
Hard Bid
Design Engineer:
Fernando Redo
Cost:
$8.8M
  • 1,000 feet long, 8-span precast girder bridge construction
  • Clear and grub
  • Concrete curb and gutter
  • Drainage pipe
  • Existing curb demolition
  • Grading and paving
  • Native plant salvage
  • Sidewalks
  • Traffic signals and lighting relocation
Tangerine Farms Four Lane Roadway 1 cropped
Tangerine Road Bridge 2 cropped

AWARDS

Town of Oro Valley

Outstanding Service Award