Heritage District Transportation Improvements

At the heart of downtown Gilbert, this award-winning project modified the intersection of Vaughn Avenue and Gilbert Road to add additional capacity and functionality. Hearne Avenue was completely rebuilt with streetscapes and plaza features, including artistic hardscape, color-changing hanging ring lights, and amenities to promote outdoor ambiance. This project was constructed while two adjacent restaurants and a parking garage were being built. Extensive utility relocations and upgrades were completed with minimal impact to the high volume of vehicles, pedestrians, cyclists, shops, and restaurants.

 

 

Client:
Town of Gilbert
Completion:
July 2018
Delivery Method:
CMAR
Design Engineer:
Tristar Engineering
Cost:
$4.49M
  • 1-inch water service
  • 12-, 15-, 18-, 24-, and 30-inch RGRCP
  • Bike racks
  • Colored concrete and fiberglass benches
  • Curb, gutter, and sidewalks removal and replacement
  • Electrical and lighting
  • Landscape and irrigation
  • Parc Vue benches
  • Pavement markings
  • Signs, posts, and foundations removal and replacement
  • Stamped asphalt crosswalks and medians
  • Traffic sign panels
  • Water valve, storm drain manhole, and sewer manhole adjustments
DSC03750 small
DSC03613

AWARDS

APWA 2020 Public Works Project of the Year

Transportation-$5 Million but less than $25 Million

American Planning Association (Arizona Chapter)

Revitalization/Redevelopment Category

American Concrete Institute (ACI)

Decorative Concrete for the Gilbert Heritage District