Florence Canal Reach 2

The Florence Canal Reach 2 Rehabilitation and Lining Project encompassed around 11.5 miles of existing earthen canals with various features, including flow control structures, equipment, turnout structures, pipes, road crossings, wells, and more. Hunter's scope of work for this project included the construction of 6 box culverts, 5 check structures, 6 headwalls, 1 trash removal structure, 1 inlet siphon structure, 1 outlet siphon structure, 3 retaining walls, 1 emergency spillway structure, and 1 large turnout drop structure. In total, approximately 7,000 cubic yards of reinforced concrete were placed, utilizing standard reinforcement, epoxy-coated steel, stainless steel radial gate embeds, Adeka Waterstop, and PVC Waterstop.

Owner/Client:
San Carlos Irrigation & Drainage District / Brosamer
Completion:
May 2023
Delivery Method:
DBB
Design Engineer
George Cairo Engineering
Cost:
$6M
  • 7,000+ CY of reinforced concrete
  • Box culverts (6)
  • Check structures (5)
  • Emergency spillway structure
  • Headwalls (6)
  • Inlet siphon structure
  • Outlet siphon structure
  • Retaining walls (3)
  • Trash removal structure
  • Turnout drop structure

AWARDS

American Concrete Institute (ACI)

2023 Winner for Sustainability