Crismon Road West

The Crismon Road extension is a 2,200 linear-foot-long new roadway project with two box culverts, curb, gutter, sidewalks, waterline, drainage, rip rap, headwalls, striping, and two cul-de-sacs located along Crismon Road alignment in Mesa, Arizona.

Client:
Sunbelt Holdings
Completion:
May 2021
Delivery Method:
DBB
Design Engineer:
Hunter Engineering
Cost:
$2.4M
  • Asphalt paving
  • Box culverts
  • Clearing/grubbing
  • Concrete
  • Demolition
  • Dry utilities
  • Grading
  • Irrigation
  • Landscaping
  • Retention ponds
  • Sewer
  • Storm drain
  • Streetlights
  • Striping and signage
  • Traffic signalization
  • Water