Town of Patagonia Improvements

The work consisted of pavement removal and resurfacing of two local streets, McKeown Avenue and Harshaw Road, two street intersections, and a portion of the corresponding cross streets, 3rd Avenue and Taylor Avenue. Other work included: flushing out and re-conditioning two local pipe drains under the two intersections, placing a pipe drain under a local driveway, and removing and resurfacing an emergency services helipad, including restoring disturbed landscaping, signage, pavement markings, and pedestrian facilities along the resurfaced streets. In addition, the work included traffic control, roadway excavation and grading, removal and replacement of signage, and other incidental work.

Client:
Town of Patagonia
Completion:
July 2021
Delivery Method:
Invitation
Cost
$1.8M
  • Concrete feature installation
  • Excavation and grading
  • Landscaping
  • Pavement markings
  • Pavement replacement
  • Pedestrian facilities
  • Re-conditioning two pipe drains
  • Signage