Site 12 Expansion

The City of Goodyear’s Site 12 Expansion design-build project included two new wells: Well #24, located south of Lower Buckeye Road and west of the flood control channel west of Cotton Lane; Well #25 located on land west of 175th Avenue and north of Broadway Road. Expansion of Site 12 to the south included earthwork, excavation, and demolition of the existing fence. Also included in the site expansion was an additional 2.0MG water reservoir, additional reverse osmosis skids, increased booster capacity from 2,000 GPM to 4,800 GPM, site layout, new perimeter fence, and landscaping to match the new El Cidro Development architectural features. The new wells and expansion area is located on land acquired by a development agreement.

Client:
City of Goodyear
Completion:
October 2020
Delivery Method:
DB
Design Engineer:
NCS Engineering
Cost:
$19.84M
  • 2 MG reservoir
  • BPS expansion from
  • 2.8 MGD to 6.9 MGD
  • Break tank
  • Cannister filters
  • Electrical upgrades
  • Mass excavation and grading
  • Perimeter masonry wall
  • Reverse osmosis (RO) system
  • RO building (new)
  • SCADA
  • Vertical turbine pumps
  • Well (new)