Power Road Improvements

Hunter Contracting Co. completed roadway improvements on Power Road from Ocotillo Road to Brooks Farm Road to match the existing gutter profile grade of the recent improvements at the Auxier Elementary School to the extent possible without affecting the grades to satisfy the Sonoqui Wash drainage requirements adequately. Additional improvements included installing a full multi-barrel Con-Arch crossing over the Sonoqui Wash with retaining walls that included a rustic wood-look form liner stained for aesthetics, curb and gutter construction, sidewalk construction, storm drain construction, drainage improvements, and SRP conduit relocation. The total length of paving improvements was approximately 3,200 linear feet.

Client:
Town of Queen Creek
Completion:
July 2019
Delivery Method:
CMAR
Design Engineer:
Stantec Consulting
Cost:
$5.62M
  • Adjust manhole
  • Aggregate base course
  • Asphalt concrete pavement
  • Bypass roadway during box culvert construction
  • Clearing and grubbing
  • Con-Arch bridge (2 barrel)
  • Concrete driveway entrance
  • Curb, gutter, and sidewalk
  • Decomposed granite for dust control
  • Excavation
  • Irrigation ditch removal
  • Pedestrian and traffic guard rail
  • Retaining wall
  • Riprap
  • Striping
  • Subgrade preparation
  • Traffic control
  • Traffic signals
  • Underground utilities (electrical, water, sewer)
  • Water meter, fire hydrant, and sign relocations
    (traffic, business, and school zone)