Grand Village Lift Station
The overall project consisted of installing two (2) 182 gpm non-clog sewage pumps, dual 4-inch force mains, gravity sewer, and electrical equipment and controls. In general, the work includes furnishing all labor, materials, and equipment for construction of the lift station and appurtenances and site facilities, including a pad for future odor control, emergency generator, and site lighting.