Desert Diamond Lift Station

Hunter completed the lift station at Desert Diamond Casino West Valley Resort that included: back-up generator,  installing a mixer in the cast-in-place concrete wet well, curb and gutter at the casino, dual six-inch HDPE force mains, electrical and instrumentation, entry gates, grading and earthwork, magnetic flowmeter, manholes, masonry site wall, MOPOs, odor control, SCADA and control, storm drain, and submersible pumps.

Client:
Tohono O'odham Gaming Enterprise
Completion:
December 2019
Delivery Method:
DBB
Design Engineer:
Wilsons Engineers
Cost:
$1.6M
  • Access drive
  • Back-up generator
  • Electrical and instrumentation
  • Entry gates
  • Grading and earthwork
  • Gravity server tie-in
  • Hybrid cast-in-place/precast wet well
  • Magnetic flowmeter
  • Manholes
  • Masonry site wall
  • MOPOs
  • Odor control
  • SCADA and control
  • Submersible pumps