Chandler Heights Road Improvements: Arizona Avenue to McQueen Road

Hunter Contracting Co. widened Chandler Heights Road from Arizona Avenue to McQueen Road to a four-lane roadway with a raised center median. The work included: subgrade preparation, grading, furnishing, and placing aggregate subbase, asphaltic concrete and Portland cement concrete paving, curb and gutter, sidewalk, drainage improvements, street lighting, traffic signals, signal interconnect, signing, pavement markings, landscaping, landscape irrigation, installing water-conserving metal landscape plants, walls/fences, utility relocations, water main replacement, sanitary sewer pipeline extension, sanitary sewer manhole rehabilitation, Union Pacific Railroad improvements and coordination, SRP Consolidated Canal improvements, erosion control, and other related incidental work.

Client:
City of Chandler
Completion:
January 2020
Delivery Method:
DBB
Design Engineer:
Kimley-Horn
Cost:
$7.3M
  • Abandon ACP water main/valves
  • Bypass system
  • Catch basins
  • Clear and grub
  • Concrete
  • Concrete pavement
  • Concrete scuppers
  • Curb and gutter
  •  Drywell
  •  Excavation to embankment
  • Insertion valves
  • Irrigation and landscape
  • Laterals and valves
  • Manholes
  • Pothole
  • Ramps
  • Relocate water services
  • Remove miscellaneous
  • Remove pavement
  • Retention
  • Rough grade retention areas
  • Services and backflows
  • Sidewalks
  • Slurry seal
  • SRP conversion work
  • Subgrade preparation
  • SWPPP and dust control
  • Tapping sleeve and valves
  • Tie-ins and connections
  • Underground conduits
  • UPRR full track replacement
  • Wall footing
  • Water main