Cardinal Insulated Glass
Furnish all labor, materials, tools, and equipment necessary to complete the demolition, site grading, asphalt paving, lime treatment, parking striping work, including but not limited to: Clearing and remove existing vegetation as required. Provide all import and/or export as required. Remove all unacceptable soil as identified by the testing engineer. Spread all excess soil on the vacant area to the west of the building. Spread soil to drain to the south, grade to a smooth surface, water as needed. Provide all off- and on-site asphalt paving in areas indicated on drawings; preparation of subbase and installation of asphalt paving areas as indicated on drawings or as required by job conditions. Excavate and/or fill and compact under all new construction areas to bring subgrade to proper elevation determined by GSS Companies, Inc.’s project superintendent and in coordination with the concrete contractor. Over excavate and compact under all footings as required per the soil report. Provide and install all required survey monuments, traffic markings, traffic delineators, barricades, and striping parking areas.