2017_Red_HCC_Logo_200x200pxl
Contact Us

701 N. Cooper Road, Gilbert, AZ 85233

(480) 892-0521

(480) 892-4932

hunter@huntercontracting.com

Follow Us

Canoa Ranch

This award-winning project includes DG path, irrigation system, seeding/planting, landscaping, park benches, ramada structure, rain harvesting cistern, wildlife drinker, bicycle parking, and equestrian staging. The Pollinator Garden is located east of the pond - Cienega area.  Installed 888 linear feet of fencing and approximately 14,500 square feet of turf. The team completed backfilling six holes using geotextile, pea-gravel, and native soil. Installed five U-channel posts, installed ten Cholla cactus plants within backfilled areas, and a hand-broadcast of hydroseed in disturbed areas.

Client:
Pima County
Completion:
July 2020
Delivery Method:
JOC
Cost:
$569K
  • DG path
  • Seeding
  • Landscaping
  • Park benches
  • Ramada structure
  • Rain harvesting cistern
  • Wildlife drinker
  • Bicycle parking
  • Equestrian staging
IMG 0796
IMG 0805

AWARD

American Public Works Association (APWA) – Arizona Chapter

2021 Public Works Project of the Year – Environment – 

Less than $5 Million