Tucson Division Projects

     
Craycroft Road - Sunrise to River Road
  • Owner: Pima County Department of Transportation
  • Size/Type of Project: $25 Million – CM@Risk project with Pima County, Engineering and Environmental Consultants, Inc., and Catalina Engineering
  • Scope of Work: Roadway excavation, retaining walls, concrete drainage culverts, new waterline installation, dry utility relocation, concrete curb and sidewalk, asphalt paving, traffic signal and landscape work. Final design and pre-construction services are ongoing.
  • Schedule: Construction began September 2005 and is to be completed September 2007.
Oro Valley Marketplace
  • Owner: Vestar Development Co.
  • Size of Project: $27.1 Million
  • Scope of Work: Retail shopping center – 189 acres located at Oracle Rd. and Tangerine Rd., over ½ million cubic yards of mass excavation, nearly 1 mile of soil cement bank protection, six new con-arch drainage structures in addition to the typical storm drainage system, new public and private sewer lines up to 21” diameter, new water lines and services, extensive site landscaping and riparian habitat restoration.  Expected future work could include all common area site lighting, dry utility joint trench including services to commercial pads, and two signalized intersections within the property limits.
  • Schedule: Began in late April, 2007, and will complete in August, 2008.
 
Tangerine Farms Road
  • Owner: Town of Marana
  • Size of Project: $23 Million
  • Scope of Work: New roadway - 3.8 mile section connecting Moore Road with Interstate 10 with multi-use lanes, a 24 foot wide landscape median, cross culvert drainage improvements, storm drain system, irrigation drainage improvements, potable and non potable water facilities, sewer facilities, furnishing and installing pavement marking and signing, installation of traffic signal, and other related incidental work.
  • Schedule: Began in November 2006 and will complete in March 2008.
 
Tucson Highway Division Past Projects
 
ADOT (Arizona Department of Transportation)
  • Tangerine Road - First Avenue to Oracle Road (6.2 Million)
  • Aviation Parkway - ($11 Million)
  • Miracle Mile TI - ($15 Million)
  • Westbound I-10 Frontage Road, Miracle Mile to Ruthrauf - ($4.5 Million)
  • Eastbound I-10 Frontage Road, Miracle Mile to Ruthrauf - ($10 Million)
 
City of Tucson
  • 12Th Avenue – Drexel to Valencia - ($3.8 Million)
  • South 6th Avenue – 16th St. to 25th St. - ($3.5 Million)
  • Harrison Road – Golf Links to 22nd St. - ($5.6 Million)
  • 22nd & Wilmot Intersection - ($2 Million)
  • Campbell Avenue – Grant to Elm St. ($3.2 Million)
  • Speedway Overlay – Grant to 22nd St. ($1.0 Million)
  • Greasewood Road – Anklam Road to Starr Pass Blvd ($1.0 Million)
  • Cienega Road – Houghton to Old Vail Road ($3.5 Million)
 
Client - Pima County
  • Thornydale Road – Ina Road to Magee Road. ($11 Million)
  • Veteran’s Memorial Overpass ($18 Million)
  • Sabino Canyon Parkway CMAR ($2 Million)
 
Town of Oro Valley
  • La Canada – Naranja Road to Lambert Road ($2.0 Million)
  • Tangerine Road – La Canada to First Ave ($10 Million)
  • La Canada – Tangerine to Moore Road ($4.8Million)
 
Town of Marana
 
  • Cortaro Road – Silverbell to I-10 ($7.0 Million)
  • Cortaro Road - I-10 to Camino De Oeste ($6.8 Million)
 
Alternate Delivery Method (ADM) Projects
  • City of Tucson Solid Waste JOC, $500,000
  • Pima County Flood Control JOC, $1,500,000.00
  • Pima county Wastewater Management – Marana WWTF-CMAR, $11,000,000.00
  • Pima County Parks & Recreation JOC $500,000.00
  • Pima County – Misc. Paving JOC $250,000.00
  • Sahuarita Civil JOC $500,000.00
  • CDO:  Omni Tucson National Design-Build $2,000,000.00
  • Sabino Canyon Parkway CMAR $2,000,000.00
 
Private Development
  • Richmond American
  • The Jonathon Group
  • Maracay Homes
  • Hall Craft Homes
  • Townsend Homes
  • Robson Communities
Industrial Clients:
  • Pima County Wastewater
  • Apache Nitrogen
  • Arizona Public Service
  • NALCO
  • City of Tucson Solid Waste
  • City of Phoenix Solid Waste
  • Phelps Dodge
  • NOVATECH
  • Department of Military Affairs
 
 

 

 

 

 

 


 
Home | Company | Specialties | Projects | Subcontractors | Careers | Contact
Copyright © 2005 Hunter Contracting Company