The Industrial Division has several jobs that are currently underway. The following
are just to name a few:
 |
CM@Risk project City of Phoenix
This Project Included:
• Phase I : $2,903,755
• Phase II : $4,457,005
• Raw Water Pump Station
• PreSed Blowdown Piping and Forcemain
• Centrifuge Feed Pump Station
• Waste Channel and Gravity Thickener Gallery
• Dewatering Building
• Chemical Building & Chlorine Building |
|
| |
|
|
| |
 |
• City of Chandler
• Design/build project
• Contract amount of $7,856,405
• HCC is constructing a new 2.0-MG circular pre-stressed concrete reservoir
along with a new 2,500 square foot building.
• This project also includes a booster pump station, which will include
vertical turbine pumps, discharge piping, valves, and magnetic flow meters. |
|
| |
|
|
| |
 |
• City of Phoenix
• CM@Risk project
• GMP for this project is $6,740,044
• Includes seven constant speed vertical turbine pumps with new site piping,
automated control valves, flow meters, and two new PRV stations. |
|
| |
|
| |
 |
• Fort McDowell Yavapai Nation
• 300,000 MGD Wastewater Treatment Plant
• GMP of $10,671,000
• This project was a SBR treatment facility completed on time and within
budget.
• The FMYN community has subsequently awarded us their $11M Sewer Collection
project currently under construction. |
|
| |
|
|
| |
 |
• City of Phoenix
• Three-year CM@Risk project
• Grossing $37,157,367
• During the construction of this project, HCC rebuilt 32 existing filters,
added four new complete filters and built one new GAC filter.
• Also included on this project iss a Dewatering Facility with Centrifuges
and a new Raw Water Intake Facility.
• Hunter Contracting Co. and the City of Phoenix won the SW Magazine over
$5M Engineering 2004 award for this project. |
|
| |
|
|
| |
• City of Phoenix
• This is our second three-year term
• Job Order Contract serving the City’s six water treatment facilities
• During our first three-year term, Hunter Contracting completed 120 projects
totaling $6,000,000. |
|
| |
|
| |
• Pulte Homes
• Design/build project
• GMP of $8,495,826.48
• HCC is working with Wilson & Company to design and build a 1.0 MGD
facility |
|
| |
|
| |
|
• City of Tempe
• CM@Risk
• GMP of $19,765,955
• Construct a new 12-MG cast-in-place concrete potable water reservoir
• Consists of the installation of a new infrastructure including water,
sewer, storm drain and electrical work.
• Construction of a new sludge drying bed and the demolition and excavation
of their existing reservoir is included. |
|
| |
| |
|
• City of Glendale
• CM@Risk Project
• GMP of $12,540,322
• HCC is constructing a second 10MG finished water reservoir
• Installation of a new water treatment plant solids drying lag
|
|
| |
| |
|
Hunter Contracting’s Industrial Division
prides themselves using the Alternate Delivery Method
for obtaining projects. This is a selection-based process
where companies are chosen based solely on their experience
with the municipalities. Below is a list of all Industrial
Division ADM projects to date. 
|
|
|
|
|
 |
|  |