|   Careers   |   MyHunter   |   About Us   |   Contact Us

CAP Superstition Recharge - Phase 1


Owner: Central Arizona Project (CAP)
Delivery Method: Design-Bid-Build
Contract Amount: $ 5.9 Million
Scope of Work: The project consisted of installing six vertical turbine pumps on a concrete girder deck bridge over the Central Arizona Project canal.

Chandler Surface Water Treatment Plant 15 MGD Expansion


Owner: City of Chandler
Delivery Method: CMAR
Contract Amount: $ 50.5 Million
Scope of Work: The Surface Water Treatment Plant 15 MGD Expansion project increased the production capacity of the plant from 45 million gallons per day to 60 million, an increase of 33%. The expansion included construction of a new raw water inlet and pump station, tied into the Consolidated Canal, new ballasted flocculation basin, and equalization basin. Hunter performed construction on chemical and electrical buildings, filtered water pump station and sludge drying areas. The construction of the raw water inlet / pump station demanded careful planning and strict adherence to the schedule. Construction time was limited to the canal dry-up cycle, and significant resources were dedicated to the work. A new Chlorine Generation system, CO2 and other chemical system upgrades, and plant-wide electrical and instrumentation installations were also completed.

Willis Well (Direct System Wells)


Owner: Town of Gilbert
Delivery Method: CMAR
Contract Amount: $ 1.9 Million
Scope of Work:

Johnny G. Martinez Water Treatment Plant


Owner: City of Tempe
Delivery Method: CMAR
Contract Amount: $ 38.2 Million
Scope of Work:

Festival Ranch Water Reclamation Facility


Owner: Pulte Homes / Buckeye
Delivery Method: Design-Build
Contract Amount: $ 8.6 Million
Scope of Work:

FOLLOW US
ARIZONA ROC070961 A | ROC067542 B | ROC075851 B-01 | ROC023057 B-04